A New York Times review of hundreds of pages of internal emails, corporate documents and federal records, as well as interviews with more than a dozen current and former employees, reveals a culture that often valued production speed over quality. Facing long manufacturing delays, Boeing pushed its work force to quickly turn out Dreamliners, at times ignoring issues raised by employees.
Complaints about the frenzied pace echo broader concerns about the company in the wake of two deadly crashes involving another jet, the 737 Max. Boeing is now facing questions about whether the race to get the Max done, and catch up to its rival Airbus, led it to miss safety risks in the design, like an anti-stall system that played a role in both crashes.
Safety lapses at the North Charleston plant have drawn the scrutiny of airlines and regulators. Qatar Airways stopped accepting planes from the factory after manufacturing mishaps damaged jets and delayed deliveries. Workers have filed nearly a dozen whistle-blower claims and safety complaints with federal regulators, describing issues like defective manufacturing, debris left on planes and pressure to not report violations. Others have sued Boeing, saying they were retaliated against for flagging manufacturing mistakes. (end of excerpt)
Click here for the full story, on the NYT website.
(EDITOR’S NOTE: Boeing’s recurring quality control problems with the KC-46 Pegasus tanker aircraft, which have led the US Air Force to suspend delivery twice in two months, should not be overlooked in this respect.)
-ends-
from Defense Aerospace - Press releases http://bit.ly/2UtXa6J
via Defense
No comments: