This modification exercises options to procure eight Lot 14 F-35A Lightning II repositioned aircraft as a result of the Republic of Turkey’s removal from the F-35 program, and six Lot 14 F-35A aircraft for the Air Force.
Additionally, this modification establishes undefinitized line items that provides recurring engineering in support of the modification of the eight Lot 14 F-35A Lightning II repositioned aircraft to a full operationally capable F-35A Air Force configuration.
Work will be performed in Fort Worth, Texas (63%); El Segundo, California (14%); Warton, United Kingdom (9%); Orlando, Florida (4%); Nashua, New Hampshire (3%); Baltimore, Maryland (3%); San Diego, California (2%); various locations within the continental U.S. (1.3%); and various locations outside the continental U.S. (0.7%).
Work is expected to be completed by May 2026. Fiscal 2020 aircraft procurement (Air Force) funds for $848,881,778 will be obligated at time of award. No funds will expire at the end of the current fiscal year.
The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
-ends-
from Defense Aerospace - Press releases https://ift.tt/3jouABp
via Defense
No comments: